top of page
IMG_8722.jpg

OPERA NORTH
- LEEDS -

IMG_8739.PNG
IMG_8739.PNG

At Opera North in Leeds, we undertook the installation of the Duo D411 Glass Infill Top Fix system for the main stair and voids.

 

This project featured the 50 Series Sigma™ stainless steel handrail, known for its sleek and modern design.

The balustrade utilized DUO HiBuild™ powder coated components, ensuring both durability and a high-quality finish.

 

For the infill, we installed clear glass infill panels that were heat soaked for enhanced safety.

 

These panels were secured with Banjo lug bolt through glass fixings, providing a clean and elegant appearance.

Designed to meet the loading requirements of 0.74kN/m and 1.5kN/m, this installation successfully combined safety, functionality, and aesthetic appeal, enhancing the architectural beauty of Opera North while ensuring compliance with stringent safety standards.

bottom of page